OOO Nemanskiy Solod
Kaliningrad |
Design engineering. Engineering of the design documentation sections named “Process Solutions” as parts of the TEOC (feasibility study) and sets of the detailed design documentation relating to the construction of the malt house with the elevator. |
|
|
|
|
|
|
|
|
Efes Beverage Group, OAO Pivovareniy Zavod Amstar
Ufa |
Design engineering. Engineering of the process flow diagrams, plant completing unit list, equipment layout plans relating to the CCV, BBV areas and filling lines. Mechanical installation work, supply of the component parts. Heat-insulation of the pipelines and vessels. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
SABMiller, OOO Kaluzhskaya Pivovarennaya Kompaniya
Kaluga |
Design engineering. Engineering of the process flow diagrams, plant completing unit list, equipment layout plans relating to the CCV, BBV areas and filling lines. Engineering of the process line producing low-alcoholic beverages. Mechanical installation work. Supply of the component parts, equipment and milk acid plant. Installation work leading to a twofold increase of the plant’s efficiency. Heat-insulation of the pipelines and vessels. Electrical installation work relating to the automatic process control systems of the process equipment. |
|
|
|
|
|
|
|
|
OOO Enviro-Chemi GmbH, OOO Kaluzhskaya Pivovarennaya Kompaniya
Kaluga |
Installation of the waste-water treatment equipment, welding work. |
|
|
|
|
|
|
|
|
Huppmann GmbH, OOO Kaluzhskaya Pivovarennaya Kompaniya
Kaluga |
Mechanical installation work for the brewery extension. |
|
|
|
|
|
|
|
|
OAO Vimm-Bill’-Dann Produkty Pitaniya, OAO Pivindustriya Primoriya
Vladivostok |
Design engineering. Designing services and installation work for the brewery upgrade. Automated CIP station. Finished beer collection tank control system. Electrical installation work relating to the process equipment. Fabrication and installation of the control cabinets of the CIP station automatic process control system. |
|
|
|
|
|
|
|
|
TOO Detroit Pivovarennaya Kompaniya, ZAO Pivovarniya Ivana Taranova
Orenburgskaya Oblast |
Design engineering. Adaptation of the import equipment to the Russian standards. Mechanical installation work. Supplies of the equipment and component parts. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
OOO Obyedinenniye Pivovarni Heineken
Irkutsk |
Electrical installation work. Brewhouse upgrade. |
|
|
|
|
|
|
|
|
ZAO Pivovarniya Moskva-Efes, ZAO Solodovniya Mutena
Moscow |
Mechanical installation work. Fabrication of the equipment, including steeping vessels, bodies and metal structures. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, AO Klinskiy Pivokombinat
Moskovskaya Oblast |
Design engineering. Mechanical installation work, organization of the construction work. Upgrade of the existing brewery. Installation of the silos. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, ZAO Bulgar-Khmel
Novocheboksarsk, Chuvashiya |
Design engineering. Mechanical installation work. Heat-insulation of the pipelines and vessels. Electrical Installation Work. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, AO Ivanovskaya Pivovarennaya Kompaniya
Ivanovo |
Design engineering. Mechanical installation work and supply of the component parts. Installation of the water treatment plants. Heat-insulation of the pipelines and vessels. Electrical installation work relating to the filling lines and water treatment plants. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, AO Saranskaya Pivovarennaya Kompaniya
Saransk |
Design engineering. Mechanical installation work and supply of the component parts. Installation of the water treatment plants. Installation and heat-insulation of the pipelines and vessels. Electrical installation work relating to the water treatment plants. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, OAO Kurskaya Pivovarennaya Kompaniya
Kursk |
Design engineering. Mechanical installation work. Electrical Installation Work. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, OAO Pivzavod Rogan
Kharkov, Ukraine |
Installation of the filling lines. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
OAO SUN Interbrew, OAO Yantar
Nikolaev, Ukraine |
Installation of the filling lines. Electrical installation works concerning the filling lines. |
|
|
|
|
|
|
|
|
BBH Holding, OAO Yarpivo
Yaroslavl |
Design engineering. Mechanical installation work. Heat-insulation of the pipelines and vessels. Electrical installation works relating to the power supply and lighting systems. Supplies of the electrical equipment and component materials. Commissioning work. |
|
|
|
|
|
|
|
|
BBH Holding, OAO Pivzavod Voronezhskiy
Voronezh |
Design engineering. Rebuild of the brewery, supplies of the component parts and equipment. Installation of the glycol cooler compressor. Heat-insulation of the pipelines and vessels. Supply of the electrical installation materials. Electrical installation work relating to the process equipment of the brewing department, filling line, power supply system. Commissioning work. |
|
|
|
|
|
|
|
|
BBH Holding, OAO Pikra
Krasnoyarsk |
Design engineering. Mechanical installation work leading to a twofold increase of the plant’s efficiency. Heat-insulation of the pipelines and vessels. Electrical installation work relating to the process equipment of the brewing department. |
|
|
|
|
|
|
|
|
BBH Holding, OAO Baltika-Don
Rostov-on-Don |
Design engineering. Mechanical installation work. Electrical Installation Work. |
|
|
|
|
|
|
|
|
BBH Holding, OAO Pivovarennaya kompaniya Zolotoy Ural
Chelyabinsk |
Design engineering. Installation work in the brewing department. Electrical installation work relating to the process equipment of the brewing department. |
|
|
|
|
|
|
|
|
BBH Holding, OAO Baltika-Khabarovsk
Khabarovsk |
Design engineering. Installation work in the brewing department. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
BBH Holding, AO Pivovarenniy zavod Slavutich
Kiev, Ukraine |
Design engineering. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
ZAO Irkutskiy Pivobezalkogolniy kombinat, ZAO Irkutskpischeprom
Irkutsk |
Design engineering. Installation of the equipment in the brewing department. Heat-insulation of the pipelines and vessels. |
|
|
|
|
|
|
|
|
OAO Vimm-Bill’-Dann Produkty Pitaniya, AO Moskvoretskiy pivovarenniy zavod |
Design engineering. Mechanical installation work. Electrical installation work relating to the process equipment. |
|
|
|
|
|
|
|
|
Pivovarennaya kompaniya Carlsberg, OAO Pivovarenniy zavod Vena
Saint-Petersburg |
Design engineering. Mechanical Installation work leading to a twofold increase of the plant’s efficiency. Heat-insulation of the pipelines and vessels. Electrical installation work relating to the process equipment, compressor station and lighting system. Supply of the component parts for the lighting system. |
|
|
|
|
|
|
|
|
OAO Vladimirskaya pivovarniya
Vladimir |
Design engineering, fabrication and supply of the yeast-cultivating plant. |
|
|
|
|
|
|
|
|
ZAO Pivovarenniy zavod Tinkoff
Leningradskaya Oblast |
Installation of the fermentation and lager tanks, bright beer tanks and water tanks. Installation of the filling line. Installation and heat-insulation of the pipeline of the filling line. |
|
|
|
|
|
|
|
|
OAO Kombinat im. Stepana Razina
Saint Petersburg |
Design engineering. Automatic process control system of the milk acid production unit. |
|
|
|
|
|
|